Manufacturing
Logistics for a running plant: raw materials and components delivered to schedule, groupage from several suppliers, export of finished goods and customs procedures for processing.
Get a quoteWhat manufacturing logistics is
A manufacturing plant depends on two flows of cargo. The inbound flow is raw materials, components, spare parts and packaging, without which the line stops. The outbound flow is finished goods that must reach customers in Ukraine and abroad on time and in the condition agreed in the contract. Manufacturing logistics ties both flows to the production plan: cargo has to arrive not "as fast as possible" but when the shop floor needs it.
This is what sets it apart from a one-off equipment move. Moving a machine tool or relocating a plant is a separate project with rigging and oversized loads, covered under the Industrial equipment industry. Here the subject is regular work: dozens or hundreds of shipments a year, repeated routes, the same documents and constant control of lead times.
Inbound supply: raw materials and components
Raw materials and components travel in different ways depending on volume and the nature of the cargo.
| Cargo | Usual mode | What matters |
|---|---|---|
| Metal, rolled products, polymer granules, paper reels | Full truck, rail wagon, sea container | Axle load, securing of heavy bundles, protection from moisture |
| Components, electronics, fasteners | Groupage, air for urgent lots | Packing, labelling to specification, completeness |
| Chemical raw materials, paints, adhesives, solvents | ADR-approved truck or container, tank container | Hazard class, safety data sheet, compatibility in mixed loads |
| Temperature-sensitive materials | Insulated body or reefer | Manufacturer's temperature range, temperature log in transit |
For each cargo it is fixed in advance who loads it and where, in what packaging, with which documents and who receives it at the plant warehouse. The more precisely a delivery is described, the less waiting there is at the border and at unloading.
Deliveries to the production schedule
Plants work with different supply models. Some keep a large stock of raw materials and order rarely but in big lots. Others move to just-in-time supply: material arrives in small lots for a specific production plan, and the warehouse is kept to a minimum. This model reduces money tied up in stock but makes the line sensitive to any delay on the road.
That is why international supply over a long leg usually combines both approaches: regular scheduled shipments and a safety stock of critical items in a warehouse near the plant. The size of the stock depends on the transit time, border queues, seasonal traffic restrictions and how many days the line can run without a delivery.
What to agree in advance
- The shipment schedule and unloading windows at the plant warehouse.
- A back-up route or mode in case a border closes or a delay occurs.
- Who reports deviations from the schedule and how.
- The minimum stock below which a delivery is expedited.
Groupage from several suppliers
Components often come from many suppliers in different countries, and none of them fills a truck alone. The cargo is then consolidated: either one truck collects from suppliers along a route (milk run), or suppliers deliver to a consolidation warehouse where full trucks or containers are built. Both methods lower the delivery cost per unit but require a precise loading schedule and correct documents for every part.
In groupage each lot needs its own invoice, packing list and entry in the transport document. A mistake in one supplier's documents can hold the whole truck at customs, so documents are checked before dispatch, not at the border.
Export of finished goods
For exports it is important to settle from the start who is responsible for what. Contracts use the International Chamber of Commerce's Incoterms 2020 rules for this: they define where the seller hands over the goods, who pays for carriage and insurance, and who handles export and import clearance. The chosen term decides which part of the route the manufacturer arranges and which the buyer does.
- EXW, FCA: the buyer arranges the main carriage; the seller hands over the goods at its warehouse or an agreed place.
- CPT, CIP: the seller pays carriage to the destination; risk passes to the buyer on handover to the first carrier.
- DAP, DPU, DDP: the seller delivers to the buyer, and under DDP also pays the import charges in the buyer's country.
Besides commercial documents, exports often need a certificate or declaration of origin if the buyer claims a preferential duty rate, conformity certificates for the destination market, and packaging that will survive the whole route.
Customs procedures for manufacturing
The Customs Code of Ukraine provides procedures designed for manufacturing. Under inward processing, foreign raw materials or components are imported to make products that are later exported, and under the conditions set by the Code import duty and taxes are not paid. Outward processing is used when goods are exported for processing or repair abroad and then brought back.
Both procedures require customs authorisation, accounting of raw materials and finished goods, and compliance with processing deadlines. Whether the procedure is set up correctly decides whether charges are assessed when the products are exported. The procedure is chosen before the first delivery together with a customs broker, not once the raw materials are already at the border.
Packaging, pallets and returnable packaging
Most manufacturing cargo travels on pallets. The standard EPAL Euro pallet measures 1200 × 800 mm, and truck loading and warehouse racking are planned around it. Pallets and crates made of raw wood for international transport must be treated and marked under the ISPM 15 international standard, or the destination country may refuse the cargo.
Many manufacturers work with returnable packaging: steel racks, plastic containers, special trays for parts. Its return has to be planned as a separate flow too, so that packaging does not pile up at the customer while the supplier waits without it.
Order of work
- The client describes the flows: what to move, from where and to where, monthly or annual volumes, lead-time requirements.
- The cargo is analysed: dimensions, weight, dangerous items, temperature requirements, packaging.
- A scheme is chosen: full trucks, groupage, a consolidation warehouse, the mode for each flow.
- The shipment schedule, unloading windows and the procedure for delays are agreed.
- The Incoterms rule and customs procedure are set, and the list of documents for each lot is prepared.
- Suppliers' documents are checked before dispatch.
- Carriage, customs clearance, updates to the client on every lot.
- Unloading at the plant warehouse, check against the packing lists.
- Regular review of the scheme: volumes, lead times, cost, options to combine deliveries.
What the client should prepare
- A list of suppliers and customers with warehouse addresses and contacts.
- Typical lots: weight, number of pallets or packages, dimensions, commodity codes (HS codes).
- For dangerous materials, the UN number and safety data sheet.
- The production plan, or at least an indicative schedule of material needs.
- Contract terms: Incoterms, who insures the cargo, document requirements.
- Details of the customs procedure if the plant works with tolling raw materials.
Frequently asked questions
How does manufacturing logistics differ from moving equipment?
Moving equipment is a one-off project: a machine or line is dismantled, packed and carried with rigging, often as an oversized load. Manufacturing logistics is regular supply of raw materials, components and finished goods to the production schedule, with repeated routes and documents.
What is just-in-time supply?
It is a model in which material arrives in small lots exactly for the production plan and the plant keeps minimal stock. It reduces inventory, but any delay in transit can stop the line, so in international supply it is combined with a safety stock of critical items.
How can cargo from several suppliers be combined in one truck?
Either a truck collects from suppliers along a route (milk run), or suppliers deliver to a consolidation warehouse where a full truck or container is built. Each part needs its own invoice, packing list and entry in the transport document.
What is inward processing?
It is a customs procedure of the Customs Code of Ukraine under which foreign raw materials or components are imported to make products that are later exported. Under the conditions set by the Code, import duty and taxes are not paid. The procedure needs customs authorisation and accounting of materials and products.
Why must wooden pallets be treated under ISPM 15?
ISPM 15 is an international standard for wood packaging that reduces the risk of spreading quarantine pests. Pallets and crates are treated and marked. Without the mark the destination country may hold or return the cargo.
Transport request
Need a reliable logistics partner?
Tell us about your cargo — the ETIKO team will plan your route and get back to you.